海上压力容器腐蚀行为的风险与检验研究
周然, 张晓蕾, 李祥锋, 凌爱军, 杜建港

Assessment and Inspection of Corrosion Induced Risk About Offshore Pressure Vessels
ZHOU Ran, ZHANG Xiaolei, LI Xiangfeng, LING Aijun, DU Jiangang
表7 生产分离器左封头失效概率计算结果
Table 7 Calculation results of POF for left head
TimeDfthinDfSSCDfHIC/SOHIC-H2SDfCLSCCDfextDfCUIFDfext-CLSCCDfCUI-CLSCCDf(t)
t=017.3110.5503.853.851572.31
RBI date (1.5)20.31.560.78783.924.581.567.820.3+55×t1.1
t=2.36A[1,4.43]20.22.571.2920.564.55.142.572.5725.34+8×t1.1
t≥4.4320.2+9×t1.1
B[1,2.38]20.42.571.2951.44.515.182.575.1425.58+20×t1.1
t≥2.3820.4+22×t1.1
C20.622.571.29128.54.535.242.5712.8520.62+55×t1.1